Hydraulic H-beam Production Line Integral Automatic with Lincoln DC1000
Place of Origin: |
Zhejiang, China (Mainland) |
Product Detail
Hydraulic H-beam Production Line Integral Automatic with Lincoln DC1000
Hydraulic H-beam Production Line Integral Automatic with Lincoln DC1000
Quick Details
- “Beam Welding Line” automatic, two heads submerged arc-welding lines for T / I girder beam.
- 2sets of American Lincon DC-1000, NA-3S SAW welding system to ensure good welding quality;
- Japan Mitsubishi PLC controller;
- Hydraulic type post deformation device to straighten the beam;
- The beam is fed into the machine and both sides of the beam are welded simultaneously.
- Save space and economize workshop; shorten the production time and improve the efficiency;
- Economize the investment of crane equipment and operator;
1. Main Parameters
Model |
ZHJ18 |
Suitable web height mm |
200—1800 |
Suitable web thickness mm |
6—32 |
Suitable flange width mm |
200—800 |
Suitable flange thickness mm |
6—40 |
Straightening thickness mm |
6—35 |
Fillet height mm |
8 |
Work-piece length mm |
4000—15000 |
Feeding speed m/min |
0.2—2 (VFD) |
Input conveyor m |
3conveyorss, each 2.6m (one powered) |
Output conveyor m |
11.5m, including lift conveyor |
Machine power kW |
18.1 |
Power supply |
AC380V, 50HZ, 3P or tailor made |
Above are our standard models and parameters, and it can be designed and manufactured on request. |
*We reserve the right to alter specifications without prior notice.
2. Introduction
H-beam combination workstation is used for H-beam or T-beam assembly, welding and straightening. It centralize the assembly, welding and straightening functions on one machine which saves space and economize workshop.Reduce workflows: shorten the production time and improve the efficiency. Economize the investment of crane equipment and operator.
- These machines are specifically designed for the manufacture of welded “T” and double “T” girder-beams with parallel or converging flange.
- They enable the welding to be carried out on items with the web located vertically and without any need for tacking.
- Tacking will only be required at the top in order to obtain the proper angle between the web and the flange.
- When double “T” beams are being manufactured, once the first flange has been welded, the beam is flipped over and fed back into the unit once again.
- This machine is capable of welding both symmetrical and non-symmetrical beams without the need for tacking;
- A flange post-deformation device mounted at the machine exit enables the machine to compensate for any flange deformation resulting from the welding process.
- This device is easily adjustable to handle various flange dimensions and a variety of different deformable thicknesses up to a maximum of 40 mm at maximum width.
- The welding line can be equipped with a control PLC from Mitsubishi.
3. Reference Photos
4. Comparative advantage
- ISO9000&CE certified;
- International warranty;
- Punctual delivery;
- Professional and experienced engineer team to ensure the advanced design about structure and electric;
- Experienced and skilled workers to care for each work flow from material cutting, welding, grinding to final assembly and testing to ensure high machine quality;
- Professional and experienced after sale service team to guarantee quick and satisfied installation, commissioning or service;
- Optimum materials and outsourcings to ensure the best performance;
- Commissioning and testing before delivery;
- Factory inspection is encouraged;
Tag: Beam welding line , Beam integral welding line , Steel structure production line
Related Search
Find more related products in following catalogs on Hisupplier.com